We got the first floor effectively baled and meshed and we moved on to the second floor. The north wall was quite a challenge, especially in putting in the top row of bales and compressing them down. We had to be creative a use car jacks to do so. With the north wall baled (minus the corners...we need scaffolding on the east and west for that), we've moved to the south wall to get the bales in before the roofers come back and put on the sleepers (think long eaves). Putting in the top row without roof sleepers is much easier.