Originally, we had wanted to keep the beams under the roof exposed. However, because our house sits too close to the property line, we are required to have fire- rated material under the eaves, which also needed to be vented. Yay more costs! The easiest material to use is gypsum board, which we installed. However, the aesthetics of that purple board leaves something to be desired, so we had it covered in shiplap wood.
0 Comments
Leave a Reply. |
AuthorKatie Jones and Peter Schmitt chronicle their building adventure. Archives
January 2024
Categories |