No pictures for this post. Today, we're laying out what's next for the Strawhouse.
1. kitchen cabinets - Eric is cranking away on building the base cabinets. He'll install those this month so that electrical and plumbing can be finished in the kitchen. 2. bathroom and bike room tile - the generic tile we chose has been on back order for four months. It is supposed to come in and be installed next week! 3. Door finishing - Katie to finish this 4. Wall and ceiling joints / window and wall joints - Katie to touch up the plaster in these areas 5. Eric builds and installs entry way cabinet/bench, under stair door, bookshelf door to the utility room. 6. Appliances, sinks, and tub are installed. 7. Move in Nov. 1.